Fort Myers and Cape Coral live in some of the toughest wind zones in Florida — and since Hurricane Ian, Lee County reviews enclosure permits with a sharper eye than almost anywhere in the state. We engineer screen enclosures, pool cages, pergolas, lanais and patios for those conditions, seal the package, and submit it to the county for you.
Few places in Florida lost more pool cages and screen rooms than Lee County did in September 2022 — and few building departments look harder at what gets rebuilt. Cape Coral's canal-front lots and Fort Myers' coastal neighborhoods sit in design wind zones far above inland Florida, which means the aluminum sections, connections and anchors that pass in Orlando simply don't qualify here. Every package we prepare for Lee County starts from that reality: the correct high-zone wind pressures for your specific address, designed to current code.

Lee County's plan review is among the most demanding in Florida, and for good reason — its structures face the wind loads that prove designs right or wrong. Here is what your application must include.
Drawings and calculations per FBC 2023 and ASCE 7-22, prepared for your address and sealed by a Florida PE, are non-negotiable. Reviewers trace member sizes and anchor capacities back to the calculated pressures — generic details get rejected.
Lee County processes applications electronically with signed and sealed digital plan sets; where paper review applies, two sets are standard. We format, file and track the submission for you.
Design wind speeds in Lee County typically run from around 160 mph up to roughly 172 mph (Vult) near the coast — among the highest in the state. The exact value for your address is confirmed per site during design, and it drives every element of the structure.
Post-Ian, unpermitted enclosure work in Lee County gets caught — by inspectors, by aerial imagery reviews, and at resale. A survey-based site plan, FL# product approvals and a complete sealed package keep your project on the right side of that scrutiny.
A destroyed enclosure cannot simply be rebuilt from its original plans. Lee County requires a new permit with new engineering to current FBC 2023 wind requirements — even on the same footprint. We prepare rebuild packages routinely, reusing the existing deck and footings where they remain sound.
High wind zone does not mean high engineering bill. The same flat rates apply in Lee County as everywhere else we work — engineering, seal and county submission included.
| Service | Flat Rate |
|---|---|
| Pool Enclosure (Screen Cage over Pool) | $2,000 |
| Screen Enclosure / Screen Room (No Pool) | $1,500 |
| Lanai Enclosure | $1,200 |
| Covered Patio | $1,200 |
| Pergola | $1,000 |
| Outdoor Kitchen | $900 |
| Concrete Slab | $900 |
| Pool Demolition | $800 |
| After-the-Fact Permit (Unpermitted Structure) | from $1,500 |
A large share of our Lee County clients manage their rebuild from out of state. Your survey, photos of the site (and of storm damage, if rebuilding) and basic dimensions are all we need to engineer and file the package.
Address, dimensions, survey and photos — damage photos help for rebuilds
Flat-rate PDF proposal with scope, price and timeline
Designed and PE-sealed for Lee County wind speeds in 5–7 business days
Filed with Lee County electronically · revisions free until approved
The rebuild has kept every aluminum contractor in Southwest Florida busy — and made engineering the bottleneck. We clear that bottleneck: correct high-zone design, complete first-pass packages, and a flat rate that lets contractors quote rebuild jobs with confidence.
We don't stretch an inland design to survive review. Lee County packages are engineered from the correct coastal pressures up — heavier sections, tighter anchor spacing, connections detailed for uplift that actually occurs here.
Replacement cages on existing decks, partial rebuilds, and after-the-fact legalization of storm repairs — we've packaged them all, and we know what Lee County wants documented on each.
Strict review punishes incomplete applications with weeks of back-and-forth. Ours ship with the wind analysis, anchor schedules, FL# approvals and site plan the reviewer will ask for — before they ask.

Engineering takes 5–7 business days. County review times have varied since the post-Ian rebuild surge — commonly a few weeks for residential accessory structures. We submit for you and resolve reviewer comments free until approval.
Among the highest in Florida — typically from around 160 mph up to roughly 172 mph (Vult) per ASCE 7-22 depending on proximity to the coast. We confirm the exact value for your address during design.
Yes, but it requires a new permit with new PE-sealed engineering to current FBC 2023 requirements — the old drawings generally can't be reused. We regularly prepare rebuild packages for Cape Coral and Fort Myers, reusing sound existing decks where possible.
Its plan review and enforcement are known to be rigorous, especially since the rebuild began. Wind design, anchors and product approvals get close scrutiny — which is exactly why complete, site-specific sealed packages clear review faster.
No. Everything runs remotely from your survey, photos and dimensions. Many Lee County clients manage their entire rebuild from out of state.
Send your survey and photos — same-day flat-rate proposal, high-wind-zone engineering in 5–7 business days, submitted to Lee County for you.