Florida Outdoor Structure Permit Checklist

Everything your county needs to approve a screen enclosure, pergola, lanai, patio cover, or pool structure — and the mistakes that get permits rejected. Print it, save it, or work through it before you apply.

⬇ Download PDF FL PE #102290 · Updated for FBC 2023 & ASCE 7-22

1 Do You Even Need a Permit?

Any roofed or screened structure attached to your home needs a permit — no exceptions in Florida.
Freestanding structures over 150 sq ft (pergolas, gazebos, sheds) need a permit and sealed engineering.
Any structure that carries wind or roof load (pergola, carport, patio cover, screen cage) needs site-specific engineering sealed by a Florida PE.
Pool enclosures, pool construction, pool demolition, and outdoor kitchens all require permits.
HOA approval is not a permit. You need both — and the county does not care that your HOA said yes.

2 Documents Your County Will Ask For

Property survey / site plan showing the structure's location, setbacks, and easements.
Signed & sealed structural drawings from a Florida-licensed PE — with the raised or digital seal.
Wind load calculations for your exact address (design wind speed + exposure category).
Foundation / footing details for posts, columns, or slab attachment.
Product approvals (Florida Product Approval or Miami-Dade NOA) for manufactured components where required.
Notice of Commencement (NOC) for jobs over the county threshold (often $2,500+).
Completed permit application and fee (county fees typically run $300–$800, separate from engineering).

3 The Engineering Must Be Right

Plans reference the current code: Florida Building Code 2023 (8th Edition) and ASCE 7-22 wind loads.
The design wind speed matches your county and site — not a generic manufacturer sheet.
The seal is from a Florida-licensed PE (a stamp from another state is not accepted).
Connections, anchorage, and uplift are shown — the most common source of reviewer comments.
A store-bought kit's "engineering sheet" is almost never enough. Florida counties require site-specific, PE-sealed plans for your address.

4 The Steps to Approval

Gather the survey and project details (dimensions, materials, attachment points).
Have the PE-sealed plans and calculations prepared for your site.
Submit the application + plans to your county (many use an online portal).
Respond to any plan-review comments (a good engineer handles these for you).
Receive the approved permit — then build, and schedule inspections.

⚠ The 5 Reasons Permits Get Rejected

Generic manufacturer drawings instead of site-specific sealed plans.
Missing or outdated wind load analysis (old code edition).
No foundation/anchorage detail for the specific soil and structure.
Survey missing, or structure drawn outside setbacks/easements.
Building an existing structure with no permit — now needs an after-the-fact permit.

Want the whole thing handled for you?

Franca Engineering prepares your PE-sealed permit package, submits it to your county, and answers every review comment — free — until your permit is approved. Flat-rate pricing, same-day quote, all 67 Florida counties.

Prepared by Cleber Franca Neto, PE — Florida Licensed Professional Engineer #102290.
This checklist is general guidance; requirements vary by county and project. Verify specifics with your local building department.