📞 Call or Text: (848) 666-3407  |  💬 WhatsApp
🏆 Most Requested Service

Pool Enclosure Permit Approved.

We prepare everything your county needs — PE-sealed structural drawings, wind load analysis, and foundation details — and we stay involved through review comments until your permit is approved.

From $2,000Flat-rate · PE-Sealed · All FL Counties · Same-Day Proposal
Service Overview

You Get Your Permit. We Handle Everything Required to Get It Approved.

Most homeowners who come to us have already been told their permit was rejected — or that they can't start without engineering drawings. We prepare everything the county needs, built around your specific location and structure, so your project doesn't stall waiting on paperwork.

  • Structural calculations and load analysis per ASCE 7-22
  • Wind load analysis matched to your county's exact design wind speed
  • Foundation and anchor bolt design for your soil conditions
  • Aluminum member sizing and connection details
  • Product approval references (FL# numbers)
  • FBC 2023 (8th Edition) compliant
  • PE-sealed by FL Licensed Engineer #102290
  • Engineering package in 5–7 business days
Pool Enclosure Permit Approved. Florida
Who This Is For

Is This Service Right for You?

✅ This Service Is Perfect For:

Homeowners installing a new pool cage or screen enclosure
Contractors needing PE-sealed plans to pull a permit
Existing enclosures requiring modifications or additions
Post-hurricane repairs involving structural aluminum members
Properties where the enclosure serves as the pool safety barrier

❌ This May Not Be Necessary If:

Projects that don't require a building permit
Properties where the enclosure already has approved PE-sealed drawings
Screen mesh or spline replacement only — no structural work
What You Get

Everything Required for Permit Submission

Not engineering jargon — concrete deliverables ready for your county building department.

📐

PE-Sealed Drawings

Complete structural drawing set signed and sealed by FL PE #102290

🧮

Structural Calculations

Load analysis, wind calculations, and foundation design

🌪️

Wind Load Analysis

County-specific ASCE 7-22 wind speed, exposure, and uplift

Foundation Details

Anchor bolt sizing, base plate, and footing specs

Product Approval Refs

FL# product approval numbers for your aluminum system

📋

Permit-Ready Package

Everything your county building department needs

What Homeowners Don’t Always Know

Important Things to Know Before You Start

Your Pool Cage Could Be an Uninsured Structure

If your screen enclosure was built without a permit, your homeowner's insurance can legally deny any storm damage claim. One hurricane and you're paying for the entire rebuild out of pocket. A permitted, engineered cage is a covered structure.

An Unpermitted Cage Can Block Your Home Sale

When you sell, title companies check permit records. An unpermitted pool cage is flagged as a violation — and buyers use it to negotiate your price down or walk away. Permits protect your investment.

Your Enclosure Needs to Double as a Legal Safety Barrier

Florida law requires every residential pool to have an approved safety barrier. An unpermitted screen enclosure — no matter how sturdy it looks — does NOT qualify legally. Only permitted, inspected structures count.

Not All Wind Speeds Are Equal

A pool cage in Miami needs to survive much higher winds than one in Gainesville. If the engineering isn't specific to your county and address, it will be rejected. We calculate for your exact location — not a generic average.

HOA Approval and County Permit Are Two Different Things

Your HOA can approve the design and materials. But only the county building department can permit the structure. You need both — and many homeowners discover this after the fact.

Post-Storm Rebuilds Must Meet Current Code

If a hurricane damaged your enclosure and it was rebuilt, that rebuild needs a permit and current-code engineering. Many homeowners discover years later that the rebuild was never properly permitted — creating liability at resale.

⚠️ Don't Let Your Contractor Start Without a Permit

Starting construction before permit approval can result in stop-work orders, fines, and forced demolition. Some contractors start work and 'figure out the permit later' — this puts the homeowner at legal and financial risk.

Why a PE Seal Matters

It’s Not Just a Requirement — It’s Your Protection

A PE-sealed package means a licensed Professional Engineer has calculated the loads, verified the connections, and staked their license on the accuracy of every drawing. In Florida — with 120–180 mph design wind speeds — this is the difference between a structure that holds and one that fails.

Your Address Determines the Wind Design

We don't use a statewide average. We calculate the wind loads for your specific address — including the correct wind speed, exposure category, and risk classification. That's what gets permits approved.

Every Bolt and Anchor Is Engineered

Pool cages fail at their connections — the anchors, base plates, and ridge joints. We engineer every connection for wind uplift forces, not just horizontal wind. That's what keeps the structure standing in a storm.

A PE's Signature Means Personal Accountability

When we sign and seal your drawings, we accept legal responsibility for their accuracy. That's fundamentally different from a contractor's sketch or a template package. You're getting verified, documented engineering — backed by a Florida PE license.

Cleber Franca Neto PE

Cleber Franca Neto, PE

Florida Licensed Professional Engineer #102290
  • Direct communication from start to finish — no middlemen
  • Real construction field experience — not just a desk engineer
  • Civil & structural engineering background
  • Same-day proposal · 5–7 day engineering turnaround
  • Serving all 67 Florida counties remotely
Test Your Knowledge

Do You Know the Rules?

Tap True or False — then see the real answer. Most homeowners get at least one wrong.

❓ Did You Know?

"An unpermitted pool cage counts as a legal safety barrier under Florida law."

❓ Did You Know?

"Wind speed requirements are the same for pool cages in Orlando and Miami."

❓ Did You Know?

"Homeowner's insurance will cover hurricane damage to an unpermitted pool cage."

Now you know what most homeowners don’t — and why getting it right from the start matters.

Get a Free Quote — Same Day →
Simple Process

How It Works

1

Send Your Details

Address, dimensions, county, and any survey or photos

2

Proposal in 24h

Flat-rate PDF proposal by email — full scope, price, timeline

3

Sign & Deposit

Digital contract signed by both parties · 50% deposit to begin

4

PE-Sealed Package

5–7 business days · 50% balance due on county permit approval

FAQ

Frequently Asked Questions

Do I need a PE-sealed drawing for a pool enclosure permit?

Yes, without exception. Florida Building Code requires PE-sealed structural drawings for all pool enclosures. A package without a PE seal will be rejected by every Florida county building department.

What happens if my pool cage was built without a permit?

Unpermitted structures create problems when selling, refinancing, or making insurance claims. Retroactive permitting requires full PE-sealed drawings and may trigger additional inspections.

How long does the permit process take?

Our engineering package takes 5–7 business days. Building department review typically takes 2–6 weeks depending on county. A complete, code-compliant package avoids revision rounds that add weeks.

Can I use your drawings in any Florida county?

Yes. Our packages are prepared to FBC 2023 with county-specific wind loads and are accepted by all 67 Florida counties.

Ready to Get Your Permit Approved?

From proposal to permit-ready package — you work directly with the Florida Professional Engineer responsible for every seal. No salespeople. No middlemen.

✓ FL PE License #102290 ✓ All 67 FL Counties ✓ 5–7 Business Days ✓ Same-Day Proposal ✓ Digital Contract
🚀 Start Your Project →
← Back to Franca Engineering LLC